Category: History
Research reveals that ancient Egyptians may have used a hydraulic lift system to raise limestone blocks for the construction of the stepped pyramid built by Pharaoh Djoser. This method, alongside traditional techniques like ramps and sledges, highlights the advanced engineering capabilities of the civilization. The study, conducted by French engineers, suggests that a complex water management system was integral to the pyramid's construction, allowing for innovative methods of lifting heavy materials.
Keywords: Egyptian Pyramids, Hydraulic Engineering, Pharaoh Djoser
Update At: 7/26/2024